ULYSSES
Ulysses HISCALE Data Analysis Handbook
Appendix 9 Geometric Factor Study for the Deflected and Unscattered Electrons of HISCALE (Buckley MS Thesis)
Figure A9-16b Ratio plots for a later time in period in 1991. Note how the ion event around day 186 affects the ratio.
Return to HISCALE List of Appendices
Return to Ulysses HISCALE Data Analysis Handbook Table of Contents
Updated 8/8/19, Cameron Crane
QUICK FACTS
Manufacturer:
ESA provided the Ulysses spacecraft, NASA provided the power
supply, and various others provided its instruments.
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane