ULYSSES
Ulysses HISCALE Data Analysis Handbook
4.11 Calculated Responses of HISCALE Sensors to Ulysses RTG Radiation
Figure 4.79 Comparison of simulation results to S/C data - LEMS 120
Figure 4.80 Comparison of simulation results to S/C data - LEMS 30
Figure 4.81 Comparison of simulation results to S/C data - LEFS 60
Figure 4.82 Comparison of simulation results to S/C data - LEFS 150
Figure 4.83 Flow chart for RTG simulation
Return to Chapter 4 Table of Contents
Return to Ulysses HISCALE Data Analysis Handbook Table of Contents
Updated 8/8/19, Cameron Crane
QUICK FACTS
Manufacturer:
ESA provided the Ulysses spacecraft, NASA provided the power
supply, and various others provided its instruments.
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane