ULYSSES
Ulysses HISCALE Data Analysis Handbook
Chapter 4: Instrument
Details
4.4 Passband Data and Calculated Responses
Table 4.7 LEMS120 parameters and logic
Figure 4.27 Energy losses in LEMS120
Next: LEFS60 parameters and logic (Table 4.8) and Energy losses in LEFS60 (Figure 4.28)
Return to Chapter 4 Table of Contents
Return to Ulysses HISCALE Data Analysis Handbook Table of Contents
Updated 8/8/19, Cameron Crane
QUICK FACTS
Manufacturer:
ESA provided the Ulysses spacecraft, NASA provided the power
supply, and various others provided its instruments.
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane