ULYSSES
Ulysses HISCALE Data Analysis Handbook
Chapter 5: Inflight Performance
Figure 5.12 Calibration plots of WART (top) and DE (bottom) channels vs. time
Figure 5.13 Calibration
plots of P' (top) and P (bottom) channels vs. time
(For larger view click
here.)
Return to Chapter 5 Table of Contents
Return to Ulysses HISCALE Data Analysis Handbook Table of Contents
Updated 8/8/19, Cameron Crane
QUICK FACTS
Manufacturer:
ESA provided the Ulysses spacecraft, NASA provided the power
supply, and various others provided its instruments.
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane