ULYSSES
Ulysses HISCALE Data Analysis Handbook
Appendix 17. LAN Analog Electronics Engineering Memos
- A17.1 Logarithmic Amplifier Thermal Compensation
- A17.2 LAN Spare - LEMS/LEFS LINEAR Offset vs. Temperature
- A17.3 LAN Spare - LEMS/LEFS LINEAR, Crosstalk in Linear Energy Channels
- A17.4 LAN Spare - LEMS/LEFS LINEAR SAMA Crosstalk
- A17.5 LAN Spare - CD Analog Crosstalk
- A17.6 Pile-up Effects in the LAN CD Analog Array
Return to HISCALE List of Appendices
Return to Ulysses HISCALE Data Analysis Handbook Table of Contents
Updated 8/8/19, Cameron Crane
QUICK FACTS
Manufacturer:
ESA provided the Ulysses spacecraft, NASA provided the power
supply, and various others provided its instruments.
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane