ULYSSES
Ulysses HISCALE Data Analysis Handbook
Appendix 7. LAN EDR Interface Specification
A7.7 List of Acronyms and Abbreviations
BAM | Bame Experiment |
BER | Bit Error Rate |
BPI | Bits Per Inch |
DACS | Data Capture and Staging Subsystem |
DMT | Data Management Team |
DOY | Day of Year |
DRS | Data Records System |
EDR | Experiment Data Record |
EDRGEN | EDR Generation (program) |
ENG E | Extracted Engineering |
ENGR | Spacecraft Engineering |
ENG S | Stand-alone Engineering |
EOF | End of File |
EOM | End of Mission |
ERT | Earth Received Time |
ESOC | European Space Operation Center |
ESTEC | European Space Technology Research Center |
FEP | Front End Processor |
GLG | Gloeckler-Geiss Experiment |
GMT | Greenwich Mean Time |
GRU | Gruen Experiment |
HED | Hedgecock Experiment |
HK | Housekeeping |
HDR | Header |
HUS | Hurley-Sommer Experiment |
ID | Identification |
IDR | Intermediate Data Record |
INST | Science Instrument |
IPC | JPL Information Processing Center |
IRG | Inter-record Gap |
ISPM | International Solar Polar Mission |
JPL | Jet Propulsion Laboratory |
KEP | Keppler Experiment |
LAN | Lanzerotti Experiment |
MDR | Master Data Record |
MOS | Mission Operations System |
PB | Playback |
PI | Principal Investigator |
QQC | Quality, Quantity, Continuity |
RSS | Radio Science Subsystem |
RTTP | Real Time Telemetry Processor |
S/C | Spacecraft |
SCET | Spacecraft Event Time |
SCLK | Spacecraft Clock (count) |
SDR | System Data Record |
SFDU | Standard Formatted Data Units |
SIM | Simpson Experiment |
SIS | Software Interface Specification |
SNR | Signal to Noise Ratio |
SRD | Software Requirements Document |
STO | Stone Experiment |
TBD | To Be Determined |
TBS | To BeSupplied |
TM | Tape Mark |
UTC | Universal Time, Coordinated |
Return to Appendix 7 Table of Contents
Return to HISCALE List of Appendices
Return to Ulysses HISCALE Data Analysis Handbook Table of Contents
Updated 8/8/19, Cameron Crane
QUICK FACTS
Manufacturer:
ESA provided the Ulysses spacecraft, NASA provided the power
supply, and various others provided its instruments.
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane
Mission End Date: June 30, 2009
Destination: The inner heliosphere of the sun away from the ecliptic plane
Orbit: Elliptical orbit transversing the polar regions of the sun outside of the ecliptic plane